Online injection molding service

Access a wide range of custom services from our specialized network of injection molding service companies. Prototype and production tooling. Upload your parts for a free quote and expert feedback.

All uploads are secure and confidential

Our custom injection molding services

Create parts of all complexities sized from 3 mm (0.12 in) to 2 m (79 in) with Protolabs Network. Lead times are as fast as 10 days, and we offer local or global production options. Our manufacturing partners typically use 20 to 3,000 ton injection machines, depending on part size, complexity, and volume. DIN 16901-130 and tighter tolerances are available on request.

Plastic injection molding

Injection molding is the manufacturing process of injecting high-pressure thermoplastic into a mold. Ideal for high-volume production.

Insert molding

A manufacturing process in which a part is molded around a pre-installed insert in the tooling.

Overmolding

A manufacturing process in which one plastic material is molded over another to create a single component.

Liquid silicone rubber molding

A thermoset process that involves mixing a two-part solution together to produce flexible and durable parts.

Find out more about the timeline. Download our Gantt chart.

Tooling - prototyping vs production

Prototyping

Ideal for rapid prototyping and low-volume production

  • Tool shot life – 1k to 100k units
  • Fast turnaround and cost-efficient construction
  • Aluminum or steel

Production

Longer-lasting tooling for larger volumes

  • Tool shot life – 100k to 1M units
  • Automated production for cost-efficiency at higher volumes
  • Hardened steel for longer life and a scalable unit price

Secondary operations

We offer several secondary operations such as painting or heat tapping inserts. You can specify which secondary operations are needed in the “custom requirements” part of your quote request. Here are some examples of secondary operations we provide:

Inserts
Pad Printing
Painting
Silk screening
Ultrasonic welding
Laser engraving
UV coating
Heat staking
Hot stamping
Post-mold machining

Gallery of plastic injection molded products

Engels machines

Industry: Agriculture  Material: PP Finish: D2

HC groep

Industry: Indoor climate technology Material: ABS Finish: as machined

LEKTRI.CO

Industry: EV charging Material: PC + ABS  Finish: VDI33

Injection molding surface finishes

SPI surface finishes

We offer any type of SPI surface finish, such as A-1, D-2 or D-3.

VDI surface finishes

We offer any type of VDI surface finish, such as VDI28, VDI30 or VDI 33.

Injection molding materials

Injection molding uses a huge range of plastics, making it ideal for many applications across nearly every industry. We can source thousands of materials on request. Please contact [email protected] for specific material requests.

Explore our Injection Molding materials

MaterialsProperty
Impact resistantABS, PMMA, PVC, PE, PC
Wear-resistantPOM, PEEK, UHMW
Dimensional stabilityABS, PBT, HIPS, PPS
Chemical resistancePEEK, PP, PBT, PE, LDPE, PA
Rubber likeTPU, TPE, Silicone
Cost-efficientPP, HDPE, LDPE
CosmeticABS, PC, HIPS

The process of our injection molding service

1. Upload your design

Upload your parts to our platform to have your project reviewed by our team

2. Receive a quote

Your account manager will work with our technical team and manufacturing partners to send you a quote within 48 hours

3. DFM & tool approval

Receive extensive Design For Manufacturing analysis to approve before construction of your tool begins

4. Receive T1 samples

We send you a golden sample for approval before starting production

5. Production & delivery

We produce your parts to match the golden sample & deliver them to you

6. Reorder as required

You can easily reorder parts by contacting your account manager

The injection molding timeline

Ready to start the injection molding process? Download our Gantt chart to help keep your injection molding project on schedule, within budget and to spec.

The Protolabs Network Standard - consistent quality, every time

Protolabs Network applies a rigorous set of standards to every custom part, ensuring quality and consistency for injection molded components. We inspect each order dimensionally and visually during and after production.

Tolerances & dimensional accuracy

Learn more

Mold finish standards

Learn more

Quality control procedures

Learn more

Our injection molding team

Manufacturing doesn’t have to be an anonymous process. We have a dedicated team of injection molding project engineers and support staff on the ground to help make sure everything runs smoothly and on time, every time.

“I take care of your parts from start to finish, making sure you receive the parts on time and exactly as you requested.”

Shak Akharov,Injection Molding Project Engineer

“I guarantee that your parts go through an extensive quality control process, so they will always be up to spec.”

Wilmer Milloria, Quality Control Manager

“I make sure we always have a manufacturing partner in our network that fits your manufacturing needs.

Ruiqi Li, Supply Chain Manager

“I ensure our customers are constantly updated on the status of the project and guarantee that they experience a smooth ordering process.”

Karlo Stetic, Injection Molding Project Engineer

Our manufacturing factory workshop

The advantages of injection molding with us

Variety of materials

Injection molding offers vast flexibility in material selection. Depending on the mechanical properties your parts require, you can achieve impact- and chemical-resistance, rubber-like elasticity and dimensional stability with molded parts. Our experts can help to manufacture molded parts that are optimized to perform in industrial applications, including parts designed for aerospace, automotive and consumer electronics. We can source thousands of custom materials on request and can advise you on the best choice for your project while minimizing your costs along the way.

Single, multi-cavity, and family molds

No matter the scale of your injection molding project, we can help you to design and build the ideal tooling and mold for cost-efficient production. As well as single molds, we can advise on multi-cavity molds that simultaneously produce multiple identical models – reducing your cost per part and speeding up production. Our manufacturing partners also work with family molds that optimize tooling costs by producing different parts within the same mold. This is ideal for parts or products that have multiple components of the same material but with different geometries.

High quality standards

The injection molding process results in finely tuned parts that are highly accurate and consistent. Protolabs Network guarantees the quality of every part that flows through our manufacturing partner network. Our comprehensive quality management processes ensure your molded parts are always up to spec, and that we only work with thoroughly vetted suppliers. We offer various types of quality documentation and can match your project with a manufacturing partner that has industry-specific certifications when required.

FAQ's about injection molding service

There are many factors that determine the cost of injection molding your custom parts. The three main expenses are tooling, materials and production. Find out how to reduce your manufacturing costs in our injection molding guide.

Customers retain ownership of all custom tooling they develop, however, any reusable proprietary components developed by the manufacturing partner (MP) will become the MP’s property. All custom tooling will remain at the MP’s facility for a minimum of two years unless otherwise agreed. If the tooling is inactive after two years, the MP may contact Protolabs Network to determine if the tool must be retained for additional time. Protolabs Network will then contact the customer to make further arrangements. Molds can be transferred to any desired location upon request and at the requester’s expense.

Whenever a manufacturing partner leaves our network, we carry the cost of transferring all molds to another MP in the network, ensuring that your parts get delivered on time.

In general, we have the RFQ ready within 24 hours. It takes two days to set up the mold and order and process the materials, and one day for packing and sending the order out to be shipped. The volume of your parts will determine the number of days required for manufacturing.

We work with a network of specialized injection molding companies that have ISO 9001 and ISO/TS16949 certifications. This way you will get the best injection molding service possible.

Your injection molding mold is kept at our manufacturing partner facilities for reuse for a minimum of 2 years.
If you would like to reorder from your mold, please contact your account manager or [email protected].

Our other manufacturing capabilities

CNC machining

Milling (3-, 4- & full 5-axis), turning and post-processing

  • 50+ metals and plastics & 10 surface finishes
  • Tolerances down to ±.0008 in (0.020 mm)
  • Lead times from 5 business days
See our CNC machining services

3D printing

FDM, SLA, SLS, MJF

  • 25+ plastics & 35+ colors
  • ±0.5% dimensional accuracy with a lower limit down to ±0.0059 in (0.15 mm)
  • Lead times from 1 business day
See our 3D printing services

Sheet metal fabrication

Laser cutting, bending, post-processing

  • 6 metals & 9 surface finishes
  • Tolerances down to ±.004 in (0.010 mm)
  • Lead times from 5 business days
See our sheet metal fabrication services